Al Babtain Hotel Project

Al Babtain Hotel Project

Commercial / Residential

Location: North Khobar
Duration: 18 months (18 months)
Start date: 24/11/2015
Contract Amount: SR 21,647,583
Summary:
The project consists of two twin hotel towers (A-B) with five floors and a roofed floor.

1 – Ground floor: It contains two reception and each hall has two rooms for management and bathroom as there are four elevators for each tower, including a separate service On the ground floor there are 10 shops with their bathrooms on the sea front.
2 – the roles of the three positions above the ground floor and has an entrance with favorable tendencies for the rise of cars by the tower A and exit from the tower B and in each role of them contains the number of 4 large rooms suitable for stores. The role of the number of forty-four parking lot and stands all the elevators in each role of them.
3. The five repeated and similar roles between tower A – B and one of the towers will be described where there are 13 apartments in one round.
4 – The role of the additive and similar between Tower A – B will be described as one of the towers where there are 4 apartments in one round.
The project is equipped with licenses for investment as hotel apartments where it contains a system of surveillance cameras, as well as alarms and fire fighting and there is an electric generator and water treatment plant and available loads of electrical equipment suitable for kitchen and sewage network equipped with oil separation tank